Most of the work was inside!
Not such a different picture from the outside, but a great deal of work was going on in the building. The upstairs partitions are now up; we've made a number of small design changes to improve the layout; and the walls are traced out ready for the electrics. External plastering is under way and the windows are expected soon!
0 Comments:
Post a Comment
<< Home